BG EN

Knowledge for bidders

Insights

Facts, examples and practice from public procurement — what leads to exclusion, which appeals succeed, and what the data shows.

The requirement that isn't in the tender file Reasons for exclusion

The requirement that isn't in the tender file

The buyer writes "in accordance with the rail infrastructure technical specification" and that one sentence attaches a whole section of requirements never included in the tender. Legally it exists. Practically nobody read it. On incorporation by reference — the quietest ground for exclusion.

Read
660,000 scanned decisions nobody reads Market data

660,000 scanned decisions nobody reads

A large share of decisions and protocols are published as scanned images with no text layer. Formally public. Practically invisible to any search. What surfaces once they are read.

Read
The reasoning that never reaches the register Appeals

The reasoning that never reaches the register

Public indexes show who won the appeal. The reasoning — why — is usually missing. And it is the reasoning that decides how the next similar dispute goes. On 6,305 rulings by the CPC and the Supreme Court, and why the operative part is not enough.

Read
How we know who won Market data

How we know who won

182,000 winner records, each tagged with where it came from: the official dump, the public API, reading the page, or a language model over the decision. Why the source matters and why the records do not all weigh the same.

Read
Construction in public procurement: €18 billion and the game of survival Market data

Construction in public procurement: €18 billion and the game of survival

What the largest sector by value in Bulgarian public procurement looks like — and why more bidders are eliminated here than anywhere else.

Read
Fuels and energy: the market of direct contracts Market data

Fuels and energy: the market of direct contracts

Where 39% of tenders are awarded without a notice, competition boils down to a single bidder, and a standardised commodity turns everything into a pure price game.

Read
Medical procurement: 36 thousand contracts and the tyranny of the lowest price Market data

Medical procurement: 36 thousand contracts and the tyranny of the lowest price

The busiest market in the country — where thousands of small deliveries are decided by cents, and one missed declaration costs the whole tender.

Read
Transport services: the market with one bidder per tender Market data

Transport services: the market with one bidder per tender

Publicly funded transport — the highest average contract value, yet the lowest competition: the winner is whoever has the fleet and the paperwork in order. An analysis of 2,748 contracts worth €1.72 billion.

Read
Vehicles and special equipment worth €4 billion: a market for the prepared Market data

Vehicles and special equipment worth €4 billion: a market for the prepared

Transport equipment in public procurement — expensive contracts, few bidders, and why the winner here is the one who is ready before the tender is even announced.

Read
How to prevent the top 50 reasons for disqualification — predictably and at scale Reasons for exclusion

How to prevent the top 50 reasons for disqualification — predictably and at scale

The most frequent grounds for exclusion, distilled from 5,679 real cases across 59 firms, are predictable — which makes them preventable. Over four fifths are documents or technical non-compliance, not price. Here's how we neutralise them systematically, before submission.

Read
Case study: the builder who lost €40M in winnable tenders to paperwork Disqualifications

Case study: the builder who lost €40M in winnable tenders to paperwork

Anatomy of one real construction firm: 2,668 bids, 389 contracts won worth €84M — and nearly 1,400 exclusions. On €40M of them it had the lowest price and still dropped out, purely over a document. The full anonymized report is attached.

Read
Why you get disqualified: the most common mistakes that sink bids Disqualifications

Why you get disqualified: the most common mistakes that sink bids

We read over 18,000 evaluation reports (4,222 exclusions) from 59 active bidders. About 1 in 4 bids is excluded on a technicality — and over 80% of exclusions are about documents or technical non-compliance, not price.

Read
Not price, but paperwork: why companies really lose public tenders Reasons for exclusion

Not price, but paperwork: why companies really lose public tenders

An analysis of nearly 19,700 bids and thousands of reports from 59 active firms: the reasons for losing cluster by sector — documents for builders, price for traders. And why public winner records often lie.

Read
Formal vs substantive reasons for exclusion Reasons for exclusion

Formal vs substantive reasons for exclusion

Most lost tenders aren't lost to a better competitive offer — they're lost to a technicality. Here's the difference between the two types of exclusion grounds, and why it decides your strategy.

Read
One in two public tenders in Bulgaria has no competition Market data

One in two public tenders in Bulgaria has no competition

An analysis of nearly 59,000 tenders and 131,000 lots (2023–2026): 45% of procedures have a single bidder. Which sectors and regions are most closed — and what it means for companies.

Read